In response to the growing need of the country’s industries for high-quality pre-painted sheets, the Zarrin Foolad Shahriari Group has established one of its most modern industrial units, Arand Lenjan Steel. Located in the Lenjan Steel Industrial Estate, this well-equipped plant, with an annual production capacity of more than 150,000 tonnes, is recognized as one of the main hubs for producing coated materials in Iran and the region.

What sets this production line apart is its continuous production technology, running at an impressive 150 meters per minute, and intelligent control systems in the coating process. This powerful infrastructure provides exceptional flexibility for customizing products, so that sheet production is managed and executed precisely to each customer’s needs – in various dimensions, coil widths, paint formulations, conversion coating types and base metals – to the highest industrial standards.

Production Line Process

Stages of pre-painted sheet production at Arand Steel: continuous coating technology

  1. Galvanized sheet enters the line and coils are joined to keep production continuous

    Start of the production process

    Galvanized sheet enters the line and coils are joined to keep production continuous

  2. Removing surface contaminants and creating a suitable base for coating

    Cleaning and surface preparation

    Removing surface contaminants and creating a suitable base for coating

  3. Creating a protective layer between the sheet surface and the paint coating

    Chemical pretreatment

    Creating a protective layer between the sheet surface and the paint coating

  4. Improving paint adhesion and increasing corrosion resistance

    Primer application and initial curing

    Improving paint adhesion and increasing corrosion resistance

  5. Applying the color and pattern coating with a clear protective layer

    Top coat and final curing

    Applying the color and pattern coating with a clear protective layer

  6. Applying an anti-scratch protective film and recoiling the pre-painted sheet into the final coil

    Finishing the final product

    Applying an anti-scratch protective film and recoiling the pre-painted sheet into the final coil

Annual production capacity

Production capacity growth in recent years

With an annual production capacity of more than 150,000 tonnes of steel sheet, Arand Lenjan Steel plays a key role in reliably supplying the domestic market and developing exports. This chart shows continuous, sustainable growth in production capacity in recent years.

Chart of annual production capacity in tonnes
  1. 2023 70,000 t
  2. 2024 120,000 t
  3. 2025 160,000 t

Success rate Quality control

Product quality control accuracy

Using multi-stage quality control systems, more than 98% of final products are approved without any need for rework. This figure reflects the company’s commitment to premium quality and compliance with international standards.

98% Products requiring no rework or return